Traffic Disturbance

Question:  ‘Will local traffic be disturbed?’
Npower says:
‘any disturbance will be limited to the construction period, about 12 months’

Npower also says:
‘there may be some bend improvements and corner widening where needed, also relaying of road surface where vertical alignment might cause a risk of grounding.’

EVAG says:
These are incredible loads.  They would have to negotiate the roundabouts and the bends of which we are very well aware.

Take a look at the photos on the EVAG website links, in particular the roads ‘before’ and ‘after’ at Cefn Croes.  Do you want our roads to look like this?
 