| Question: ‘Will local traffic be disturbed?’ | Npower says: ‘any disturbance will be limited to the construction period, about 12 months’
Npower also says: ‘there may be some bend improvements and corner widening where needed, also relaying of road surface where vertical alignment might cause a risk of grounding.’
| EVAG says: These are incredible loads. They would have to negotiate the roundabouts and the bends of which we are very well aware.
Take a look at the photos on the EVAG website links, in particular the roads ‘before’ and ‘after’ at Cefn Croes. Do you want our roads to look like this? | | |
|